
Intercity
EMU
First-Generation
Malaysia ETS Intercity
EMU (ETS1)
Developed on CRRC ZELC’s proven intercity EMU platform, the First-Generation Malaysia ETS Intercity EMU (ETS1) was engineered to meet the operational demands of Malaysia’s long-distance intercity operations.
AC 25 kV 50 Hz Overhead Catenary
Power Supply
6-car set
Formation
140km/h
Max. Operating Speed
704passengers
Passenger Capacity (AW3)

Design
Inspiration
The interior combines barracuda-inspired marine elements with Islamic design motifs, reflecting Malaysia’s cultural identity.
160km/h
Highest Design
Speed for Metre-
Gauge EMUs
At 160 km/h, ETS1 ranks among the world’s fastest metre-gauge EMUs, delivering exceptional performance for modern intercity rail services.
Technical data
| Power Supply | AC 25 kV 50 Hz Overhead Catenary |
|---|---|
| Track Gauge | 1000 mm |
| Train Configuration | Mc–Tp–M1–M2–Tp–Mc |
| Formation | 4 motor cars & 2 trailer cars |
| Max. Operating Speed | 140 km/h |
| Max. Design Speed | 160 km/h |
| Starting Acceleration (0–40 km/h) | ≥ 0.7 m/s² |
| Max. Service Braking Deceleration | ≥ 1.0 m/s² |
| Max. Emergency Braking Deceleration | ≥ 1.2 m/s² |
| Passenger Capacity (AW1 / AW2 / AW3) | 312 / 508 / 704 passengers |
| Axle Load | ≤ 15 t |
| Length | 139600 mm |
| Width | 2750 mm |
| Height | 3905 mm |
| Wheel Diameter (new / worn) | 850 mm / 770 mm |

Discover
next
Second-Generation Malaysia ETS Intercity EMU (ETS2)


